Restoration diary

Reports of restoration work on 50029 and 50030.

Work party report 14th November 2021

​Mark, Dave, Jay and I were on site today.Mark ground off the remains of the anti-slip treads in the gen compartment where they had rotted away or been broken off, in preparation for Ian the welder to fit new ones. He will also fit new ones in places alongside the engine walkways.Jay and I carried belling out wiring in the electrical cubicle, ...
Continue reading
1591 Hits
0 Comments

Work party report 8th August 2021

Dave Rolfe, Jay Hirst and I were on site. We continued the repetitive and rather dull-but-necessary task of cleaning out the engine room in 50030 ready for the return of the power unit nad overhauled generator in due course.Dave had found some heavy duty degreaser spray, and we used it on the sides of the engine compartment at the generator end whi...
Continue reading
1651 Hits
0 Comments

Work party report 20th June 2021

Work party report 20th June 2021
Carl and Sofy Looker, Dave Rolfe and I were on site on Sunday 20 June and between us we carried on scraping, cleaning and painting the engine room inside 50030, getting to about three quarters prepared and undercoated.
Continue reading
2344 Hits
0 Comments

RRRG Newsletter issue 46 released

We are pleased to announce that issue 46 of the RRRG newsletter is now available to view, but until issue 47 is released it will be exclusively available to members of RRRG logged into the website with a valid username and password. At the same time, non-members can now view the picture gallery of the power unit lift from September 2020. Issue...
Continue reading
2056 Hits
0 Comments

Work party report 16th May 2021

Work party report 16th May 2021
​Mark Burrows and his son Robert, Jay Hirst and I were on site on May 16th. Following on from the work done by Ian Williams that we talked about previously, we carried on repairing the bodyshell of 50030 taking the opportunity of better internal access whilst the power unit is out. Mark and Robert continued on the outside of the no 1 cab around the...
Continue reading
2261 Hits
0 Comments

Roof and body repairs spring 2021

Roof and body repairs spring 2021
As we've mentioned in previous posts here, one of our key tasks recently has been to fully repair the bodyshell of 50030 to make it fully watertight and ready to have its overhauled electrical machines installed. We have been hiring well-known locootive welder Ian Williams for this. Recent work has been to the roof and body sides of 50030. Many yea...
Continue reading
2364 Hits
0 Comments

Work party report 18th April 2021

Work party report 18th April 2021
A key priority for us now that the power unit is out of 50030 is to get the bodyshell watertight. There's no point us putting overhauled mechanicals and electrical machines back in there if they are only going to get wet! The same applies to the cabs as we move on to refitting and restoring the controls and air pipes behind the driver's desk. We've...
Continue reading
3021 Hits
0 Comments

A post-lockdown update

50030 following additional welding work in April 2021
Like many UK preservation groups, RRRG has been affected by the coronavirus crisis and government-mandated lockdowns. Along with all of the other groups at Rowsley, for a second prolonged period from late 2020 until early April 2021, we have not been allowed to attend Peak Rail to work on our locos, other than essential maintenance. This has basic...
Continue reading
2195 Hits
0 Comments

RRRG newsletter issue 45 released

Once again our newsletter editor Andy Rowlands has turned out a new issue of our news magazine "Raconteur", issue 45 - this one packed with pictures of the big engine lifts on 29th September 2020 (plural, yes, as two engines had to be lifted!). This issue is currently only available to paid up, logged in RRRG members.Chairman Mark give...
Continue reading
2434 Hits
0 Comments

Power unit lift 29 September 2020

With grateful thanks to technical officers from the Class Fifty Alliance, a highly professional operation by contractors Steve Foster Cranes, the generous patience of our hosts Peak Rail and technical members of RRRG, on 29th September 2020 we successfully lifted the power unit from inside 50030, removed turbochargers from the ex-50008...
Continue reading
2455 Hits
0 Comments

Working party report 4th-5th July 2020 and welding update

Working party report 4th-5th July 2020 and welding update
50030 no 2 end secondman's side, which Mark and Robert Burrows flatted down and painted in primer.
​Following our first working party after the enforced COVID shutdown on the 27th and 28th June, we held our second pair of working parties on the 4th and 5th July.Dave Rolfe, my son Robert and I attended site on the Saturday, and Dave was also there part of Sunday. Dave pumped oil round the ex-50008 engine on both days and barred it ov...
Continue reading
2999 Hits
0 Comments

Working Party Report 28th June 2020 - Return To Site!

50030 as seen in late June 2020. The external appearance has not been our priority and we have put most effort into internal restoration prior to a power unit swap planned for this summer.
Dave Rolfe, my son Robert and I went to Rowsley on Sunday 28th June (Dave was also there the day before), this being the first working party for about 3 months since the national lockdown was put into place.I took to site a number of items of anti-virus PPE and at the request of Peak Rail, our new working procedure required to take account of ...
Continue reading
2730 Hits
0 Comments

Sunday Sentimentalities no 2 - remembering Class 50s on Cross Country

It is April 1984 and 50030 is approaching Bristol Temple Meads from the south west, passing beneath the Bath Road overbridge in this shot by an unknown photographer taken from the end of the platform. Unfortunately we can't identify much more such as the exact service that Repulse was hauling, as the sub-par lighting conditions make it difficu...
Continue reading
2508 Hits
0 Comments

Sunday Sentimentalities no 1

To help pass the time during the current lockdown, we've been going through the RRRG image archive to pick out some workings from the BR careers of our two locomotives. We'll be posting these occasionally to hopefully stimulate a bit of discussion but also just to show some photos that have probably never been seen before. The date is 25th Jan...
Continue reading
2630 Hits
0 Comments

We haven't gone away!

​We haven't posted anything for a while by way of updates. Winter is always a quiet period for RRRG; Peak Rail is often closed in January and we concentrate on off-site work before resuming work parties in March. Except of course this year the global coronavirus pandemic struck and non-essential travel was curbed. So we couldn't resume on site work...
Continue reading
2798 Hits
0 Comments

Work party report 27th October 2019

Carl and Sofy Looker joined me today on site. They started scraping loose paint off the inside of the engine compartment, then washing areas with White Spirit and very soapy water, to see which shifted the accumulated oil film and carbon soot better. The best combination seemed to be White Sprit first, followed by the soapy water. They washed off t...
Continue reading
3364 Hits
0 Comments

Work party report 20th October 2019

Wes Needle, Mark Burrows, Robert Burrows (Mark's son) and I were on site today. Wes carried on sorting 50030 No.1 cab desk panels to make them fit properly, including fitting new hinges, Mark and Robert painted yellow gloss over the new steel on the cabsides and No.1 cab front, to protect them over the winter. I painted the fire extinguisher tubes ...
Continue reading
3335 Hits
1 Comment

Work party report 20th July 2019

I went up again today as welder Ian needed access inside Repulse. Ian Kemp and Peter Carter were also there barring the ex-50008 power unit round and pumping oil through it. We do this as a mattter of course at each work party just to ensure this power unit remains in good internal condition ready for insertion into 50030 later this ye...
Continue reading
3467 Hits
0 Comments

Work party report 14th July 2019

This weekend we had Ian Williams the welder on site, starting the bodywork repairs on Repulse. Joining me today was Mark Burrows, Carl and Sofy Looker.Ian cut out rotten steel around No.1 cab end and along the 'non-visible' side, where we had identified the worst corrosion. He did most of the cutting out yesterday, today was clearing the rusty debr...
Continue reading
3298 Hits
0 Comments

Work party report 6th May 2019

Ian Kemp decided to go to site today as it was a bank holiday and he wasn't working. Wes Needle was available too so I went as well.Quite a productive day, Wes was in No.1 cab again, fitted the windscreen washer control and washer button he'd overhauled, and made a repair to a conduit under the floor. He took away a section of cab panelling to rep...