As one of RRRG's electrical officers I will write about my specialist field as well as general reports of work on site.

Work party report 27th October 2019

Carl and Sofy Looker joined me today on site. They started scraping loose paint off the inside of the engine compartment, then washing areas with White Spirit and very soapy water, to see which shifted the accumulated oil film and carbon soot better. The best combination seemed to be White Sprit first, followed by the soapy water. They washed off t...
Continue reading
460 Hits
0 Comments

Work party report 20th October 2019

Wes Needle, Mark Burrows, Robert Burrows (Mark's son) and I were on site today. Wes carried on sorting 50030 No.1 cab desk panels to make them fit properly, including fitting new hinges, Mark and Robert painted yellow gloss over the new steel on the cabsides and No.1 cab front, to protect them over the winter. I painted the fire extinguisher tubes ...
Continue reading
575 Hits
1 Comment

Work party report 20th July 2019

I went up again today as welder Ian needed access inside Repulse. Ian Kemp and Peter Carter were also there barring the ex-50008 power unit round and pumping oil through it. We do this as a mattter of course at each work party just to ensure this power unit remains in good internal condition ready for insertion into 50030 later this ye...
Continue reading
817 Hits
0 Comments

Work party report 14th July 2019

This weekend we had Ian Williams the welder on site, starting the bodywork repairs on Repulse. Joining me today was Mark Burrows, Carl and Sofy Looker.Ian cut out rotten steel around No.1 cab end and along the 'non-visible' side, where we had identified the worst corrosion. He did most of the cutting out yesterday, today was clearing the rusty debr...
Continue reading
810 Hits
0 Comments

Work party report 6th May 2019

Ian Kemp decided to go to site today as it was a bank holiday and he wasn't working. Wes Needle was available too so I went as well.Quite a productive day, Wes was in No.1 cab again, fitted the windscreen washer control and washer button he'd overhauled, and made a repair to a conduit under the floor. He took away a section of cab panelling to rep...
Continue reading
1031 Hits
0 Comments

Work party report 21st April 2019

Work party report 21st April 2019
I went up to site yesterday as Ian Kemp was bringing some helicoils as a possible solution to the radiator resistor backplate problem (see previous work party reports). After we'd looked at them and decided they may well solve the problem, Ian and Peter Carter took measurements off the power unit for the upcoming lift, barred the engine round as th...
Continue reading
857 Hits
0 Comments

Work party report 10 March 2019

No 1 end cab 50030 with panelling refitted.
Bogie brake adjusters refurbished and ready for refitting to the bogies to replace worn adjusters removed previously.
A good day on Sunday, despite the Arctic wind in the morning. Wes Needle had a very productive day. He started the day by cleaning the debris from under No.1 cab floor on the second man's side. Then, with Dave's help, they checked the operation of the handbrake mechanism under the floor. They found that the pivot nut required tightening and a new s...
Continue reading
1338 Hits
0 Comments

Work party report 17th February 2019

Dave Rolfe, Wes Needle and I were on site on Sunday 17th February. Peak Rail have been reorganising their site during the first weeks of 2019 and opportunities for work parties were also limited by the weather. Dave was removing the brake adjustment parts off the bogies, as he'd identified some that were either worn or where there appeared to be ...
Continue reading
1229 Hits
0 Comments

Work party reports update December 2018

Ian Kemp, Peter Carter and Dave Rolfe have been finishing off fitting pipework onto the ex-50008 power unit, and have started removing the injectors for inspection, before they go off for overhaul. Dave has been overhauling, cleaning and temporarily fitting items onto the brake frame so we know where everything goes. They will need removing to get ...
Continue reading
1583 Hits
0 Comments

Work party reports July/August 2018

The radiator compartment in 50030 following reinstallation of the overhauled radiators.
Deborah Stokes testing the voltage on the batteries still inside 50030.
The first two radiator fan resistor backplates were refitted on a test basis.
Deborah Stokes removed the batteries from 50030 to top up distilled water levels and attempt to charge them up.
The heat exchanger for the overhauled power unit intended for 50030 was overhauled last year and has now been fully installed complete with all pipework.
After four hours connected to a car battery charger, the voltage on the batteries doubled, although they won't be good enough to actually fire 50030 up.
I have been offline with PC problems for the last few weeks so work party reports haven't been added! So here's a bumper update rolling up all the work on site during the last month or so since the last report in mid July.The last three workparties saw myself, Dave Rolfe, Deborah Stokes, Wes Needle, Carl and Sofy Looker and Mark a...
Continue reading
2118 Hits
1 Comment

Work party report 15th July 2018

The No 1 end cab of 50030 showing various patches done over the past few weeks. Hot summer weather is generally a good time to attend to jobs like these.
Cabside rot is the bane of all Class 50 owners. Drainage channels from the side windows in the cab become blocked and allow water to build up. We patched ours up a few years ago but the problem is starting to come back.
Cab footsteps are another troublesome area although not nearly as bad. Note the SmartWater sticker: we in RRRG have been using this service for a number of years now and we highly recommend it as a cheap and effective anti-theft deterrent for all locomotive owning groups.
​Mark Burrows, his son Robert and I were on site today. Mark and Robert carried on scraping, bashing, fibreglassing, filling, sanding and priming around the no.1 cab of 50030, while I had a good tidy up on the shelves opposite the electrical cubicle, then Mark helped me fit the three rad resistor backplates along one side of the rads. Apart from th...
Continue reading
2302 Hits
1 Comment

Working party report 24th June 2018

The no 1 end cab of 50030. This was last repainted about ten years ago when we first purchased the two locomotives and agreed with our hosts at Peak Rail that they should be repainted.
Ten years outdoors exposed to the elements hasn't been hugely kind to the paint job and the traditional cabside rot is starting to show. The aim is to do a quick repair job whilst the weather is fine and keep 50030 looking presentable and improve weather proofing.
A full repaint of 50030 isn't on the agenda for now as we concentrate on the mechanical aspects so we decided just to concentrate on removing rusty patches and getting primer onto the bare metal followed by undercoat to at least seal the repaired area away from the weather.
Mark Burrows and his Robert plus myself were on site today. Mark and Robert carried on where my partner Mae had got to on the no.1 end cabsides of 50030, removing rusty paint bubbles, grinding and sanding smooth where possible, then adding filler, sanding again and priming, then painting with grey undercoat. When purchased in 2002, both 50029 and 5...
Continue reading
2318 Hits
1 Comment

Work party report 3rd June 2018

Interior of the radiator fan compartment, showing the overhauled radiators that we recently reinstalled into 50030.
The two radiator fan resistor backplates fitted for spacing checks.
Two of the radiator drain cocks fully connected
​My fiancee Mae joined me on site today, along with Carl and Sofi Looker. While Mae was hammering, poking and scraping at rust spots around the lower parts of the no.1 cab on Repulse (a recent target area we had decided to tackle), Sofie was top-coating one side of the six radiator fan resistor backplates, while Carl and I lifted and bolted tw...
Continue reading
1481 Hits
0 Comments

Work party report 11th March 2018

Work party report 11th March 2018
Radiator fan roof panel nearing completion of refurbishment.
Dave Rolfe and I were on site today. It was more of a sorting stuff out day than doing much actual work as it was my first day back since December. I did manage to clean off the sixth radiator fan resistor backplate and undercoat the second side of two that weren't done last time, and I grabbed a picture of the completed fan roof underside now it's...
Continue reading
2570 Hits
0 Comments

Work party report 15th October 2017

Work party report 15th October 2017
​Carl Looker and his daughter Sofia put a third coat of black on the radiator room floor, than cleaned four of the rear mounting plates for the rad fan resistors which go above the walkways alongside the rads. There are three each side. The plates were only very lightly corroded as they get covered in dust and debris drawn in through the rad grille...
Continue reading
2027 Hits
1 Comment

Work party reports 19th June, 27th August 2017

​19/6/2017 Deborah Stokes and I completed the rail grey topcoating in the radiator compartment, Dave Rolfe refitted another part of the radiator shutter actuating mechanism, while Wes Needle carried on in no 1 cab, refitting panelling to the driver's desk, though not without some effort as the panels were warped from storage and previous rushed fit...
Continue reading
1949 Hits
2 Comments

Working party report 28th May 2017

Whilst we have the radiators removed from 50030, attention has turned to the radiator compartment inside the bodyshell with the aim being to refurbish it as quickly as possible. The reason for this is that we have the refurbished radiators back in our care, but we quickly decided that the best place to store them was where they came out from - name...
Continue reading
1078 Hits
2 Comments

Working party and restoration report 7th May 2017

Most of our efforts since Christmas have concentrated on preparing the radiator compartment for the return of the radiators now they have been repaired. It's been all hands on deck to clean up years of accumulated debris, attend to lots of corrosion, especially around the blower duct on the floor and the electrical trunking that runs either side ju...
Continue reading
2171 Hits
3 Comments

Work party reports 22nd August, 19th September

On 22nd August Dave Rolfe and I were on site. Dave was having a good sort out of our storage as it had got a bit untidy, which was preventing us from finding items we need for the actual restoration project, and disposing of offcuts of some wood that we don't need. I carried on undercoating in the Thin Man's and a bit round the front of the cu...
Continue reading
2320 Hits
1 Comment

Working party report 24th July 2016

​Dave Rolfe and I were on site today. Dave was freeing up one of the cab doors on Repulse while I carried on undercoating in the Thin Man's and over the cubicle inside the same locomotive.  Ian Kemp was on site the previous Saturday and they unbolted the remaining pipes and connections to the radiator fan currently inside 50030,...
Continue reading
2009 Hits
0 Comments