Restoration diary

Reports of restoration work on 50029 and 50030.

Announcement of working party dates and details of restoration work carried out at working parties.

Work party reports 25th May and 1st June

Work party reports 25th May and 1st June

If you've been following RRRG for some time, you might know that we have in our spares stock a genuine Class 50 reverser and a Class 37 example, which is similar but not identical to the Class 50 part.  We had removed the genuine 50 reverser in order to use it as a template to modify the 37 item to Class 50 spec, and in the meantime the ex-37 reverser was installed in 50030's electrical cubicle so that I could judge how long to make the wiring whilst rebuilding the cubicle.

b2ap3_thumbnail_37-reverser.JPG

On Sunday May 25th I disconnected the main cables from the back of the ex-37 reverser, and with Dave Rolfe's help, got it out of 30 and into the container. I cleaned the main power contacts on the the proper 50 reverser and labelled each contact bar while Dave was finishing drilling out sheared bolts around the removable grille that gives access into the No.1 end clean air compartment. Whilst cleaning I happened to notice the auxiliary contact blocks appeared to be facing the wrong way, so I went to Washwood Heath during the week to check 50008 Thunderer, and found they had indeed been refitted the wrong way round after we had taken them apart to make a replica second set to modify the 37 reverser for use in 29.

b2ap3_thumbnail_37-reverser-out.JPG

Whilst working around the cubicle area in 50030, I was impressed by work that Mark Burrows has been doing to restore the cable conduits for the traction cabling to the main generator.  This has been a laborious task using the best parts of conduits salvaged from 50023 and 50040 before those locomotives were scrapped a few years ago.

b2ap3_thumbnail_gen-conduits.JPG

On 1st June Ian, Pete and Dave refitted the decompressor plugs into the power unit, then spent the rest of the day cleaning parts of the power unit ready for painting.

b2ap3_thumbnail_PU-work-1-June-2014.JPG

On the same day, I removed the auxiliary contact blocks from the Class 50-spec reverser and fitted them the right way round, in the process realising that the internal cams had been rotated out of their correct positions, so they wouldn't open and close in the correct sequence. The afternoon was spent getting them back into the correct alignment.  Now that the reverser has been properly adjusted, my next task will to fit it back into the electrical cubicle in 50030.

b2ap3_thumbnail_50-reveser-cleaned.JPGb2ap3_thumbnail_50-reverser-aux-contacts-corrected.JPG

Continue reading
6656 Hits
2 Comments

Radiator mounting nuts

Radiator mounting nuts

No, we haven't packed up and ceased to exist.  Yes, we have been a bit quiet.  Sorry about that - normal service to be resumed but a number of us have had things other than RRRG to deal with and our day lives have got in the way.

 

Ian Kemp and Dave Rolfe decided today to tackle a job we started some time ago but ended up leaving to another day.  This was to remove the remaining radiator securing nuts, so that we can lift the radiators out of 50030 and have them sent away for overhaul.  Given that the radiators were most likely last removed at refurbishment in the mid-1980s it goes without saying that the fastening nuts were stuck on very firmly indeed.  We had previously managed to remove three of them, leaving five left to do.  A potent combination of elbow grease, tools (and broken tools), purple language and in the case of one particularly stubborn nut, chiseling has now freed all eight nuts and the radiators can now be lifted out.  It's the seemingly little tasks like this that end up taking so much time.  Photos courtesy Ian Kemp.

 

b2ap3_thumbnail_DSC_0154.jpg b2ap3_thumbnail_DSC_0156.jpg

Continue reading
10302 Hits
0 Comments

Radiator louvres re-assembled

Fully overhauled and reassembled radiator louvre

Continue reading
7407 Hits
0 Comments

Radiator louvre slats and mechanism finished, donor electrical cubicle wiring loom progress

Radiator louvre slats and mechanism finished, donor electrical cubicle wiring loom progress

Work on site over the weekend of 13-14 June comprised efforts by Dave Rolfe to finish off the last set of radiator grille louvre frames and slats.  These have now been sanded and painted ready to reinstall into 50030 and will mean the locomotive has a fully overhauled set of radiator slats, together with the mechanisms for actuating and moving the temperature-dependent sets fully overhauled and operational for the first time in many a year!

b2ap3_thumbnail_IMG_1081.JPG b2ap3_thumbnail_IMG_1080.JPG
b2ap3_thumbnail_IMG_1078.JPG b2ap3_thumbnail_IMG_1079.JPG

Also on site were electrical officers Andy Rowlands and Steve Tripp, together with Sarah McCall the membership secretary.  They carried on with the donor electrical cubicle. Following recent progress with removing the control units, attention turned to the wiring loom which we also intend to salvage in order to replace the damaged wiring in 50029.  Initially the complexity of the loom and its many tentacles proved frustrating but Steve and Andy have devised methods for transferring it into Renown. All the cabling in all the side sections of the cubicle, namely that for KV10s, relays and control units, has been pulled out of the frame or into the middle section where it is more accessible.  One more visit should have the whole wiring loom out and hopefully soon into its new home in 50029.  We can then consider our options for the bulky frame of the donor cubicle which is taking up valuable space on site.

Continue reading
14915 Hits
0 Comments

Work party report 29-30 June

Work over the weekend of 29-30 June involved stripping and painting the last of the louvre mechanisms for the radiators in 50030, hopefully to be refitted in 2-3 weeks.  Photos to follow.

Continue reading
7461 Hits
0 Comments